Tuesday roundup, Week 41. Productivity, marketing, and coding each ship two flagship prompts this week, closing the gap from last Tuesday and bringing the full library to 147 prompts. All seven categories now sit at 21, the cleanest state the corpus has reached since the early-summer ramp. Each new prompt is a multi-task operating system — input sections, calibrated defaults, and a 12-to-18-step playbook rather than a single ask.
Productivity — 21 prompts
New: Recovery-Protocol Engineer & Burnout-Prevention Lead and Calendar-Architecture Specialist & Meeting-Load Engineer. The Recovery-Protocol Engineer (14 years shipping named recovery protocols) targets staff engineers, founders, and senior ICs running 60+ hour weeks, with named burnout-down-cycle hitting 64-100% and named deep-work-hours recovering 18-52% per week inside two quarters of structured recovery discipline. The Calendar-Architecture Specialist (12 years building named calendar architectures) is built for VPs and directors at 80% meeting saturation, where named maker-time hit 28-46% weekly and named shipped work-per-quarter lifted 24-58% inside two quarters. Use the Calendar Architect on a Monday morning to redraw the week before the calendar wins.
Marketing — 21 prompts
New: Channel-Economics Analyst & CAC-Payback Strategist and Positioning-Iceberg Engineer & Category-Design Strategist. The Channel-Economics Analyst (14 years modeling named channel economics) targets B2B SaaS CMOs and heads of growth, where named blended CAC dropped 22-48% and named CAC payback compressed from 22-38 months to 8-14 months inside four quarters. The Positioning-Iceberg Engineer (14 years building named category positions) is built for B2B founders and PMM leaders, with named sales-cycle dropping 18-42% and named inbound share lifting 22-58% inside three quarters of disciplined positioning. Best one-line move: drop a competitor comparison into the Positioning-Iceberg Engineer and ask for the two claims above the waterline.
Coding — 21 prompts
New: Code-Review-Signal Engineer & PR-Throughput Optimizer and Test-Failure-Triage Engineer & CI-Signal Reliability Specialist. The Code-Review-Signal Engineer (14 years shipping named review systems) targets engineering directors and VPs, where named PR cycle time dropped 32-58% and named review rework rate dropped 22-48% inside two quarters. The Test-Failure-Triage Engineer (also 14 years shipping named CI systems) is built for senior staff and platform leads, where named flaky-test rate dropped 58-82% and named engineer-to-trusted-CI ratio hit 92-100% inside three quarters. Drop the last week of CI failure logs into the Triage Engineer before the next on-call rotation.
Job Hunting — 21 prompts
No new prompt this week. The existing 21 remain, anchored by the Staff+ IC Behavioral-Loop Coach (week-21) for L7-L9 ICs targeting FAANG and AI labs, with named placement lifting from 38-62% to 64-88% inside one quarter. Good day to revisit the offer-counter flagship before a recruiter screens tomorrow.
Content Creation — 21 prompts
No new prompt this week. The existing 21 remain, with the Paid-Newsletter Operator (week-21) leading the paid-conversion suite, where named paid conversion hit 4-9% and named 12-month LTV lifted 28-66% inside two quarters. Pair it with the cross-platform distribution lead when next week's flagship piece ships.
Research — 21 prompts
No new prompt this week. The existing 21 remain, with the User-Research Synthesis Lead (week-21) anchoring the synthesis suite, where named insight-memo adoption hit 64-92% and named insight-to-roadmap conversion lifted 22-58% inside two quarters. Run the JTBD extractor on last quarter's interview transcripts.
Email — 21 prompts
No new prompt this week. The existing 21 remain, anchored by the Cold-Outbound SDR Sequence Architect (week-21) for B2B SaaS SDR teams, where named reply rate lifted 2-6% to 8-18% and named pipeline-per-outbound-SDR lifted 32-78% inside two quarters. Solid day to audit the trigger-event map against a new product launch.
What to try first
Pick the prompt that matches your hardest this week. Calendar drowning? Run the Calendar-Architecture Specialist on Monday before the week locks in. Pipeline flat? Drop the last quarter's CAC chart into the Channel-Economics Analyst. PR review queue growing? Push the last 10 review threads through the Code-Review-Signal Engineer. All seven categories now sit at 21, so whatever role owns your week, the library has a flagship for it. See you next Tuesday.